This project raised the roof, quite literally.
The existing building was not high enough to install new manufacturing equipment, so B&E were called in to add a new “pop up” lifting the roof to a new height of 22 metres. Half of the existing roof was removed and new steel columns added to achieve the new height and the building was then also extended. The building was treated to new cladding, to give a clean and smart appearance.
B&E