The units were designed to look like shipping containers but in fact were modular buildings that are fully compliant current building regulations.

 

The buildings require minimum ground works and were manufactured at our factory with each room containing a wet room two single beds and a double bed, we then transported them to site and assembled them together which enabled the client to have an entire hotel built within 6 months and able to open it for business.

The units were designed to look like shipping containers and were manufactured at our factory we then transported them to site and assembled them together.

B&E